Take The Uncertainty Out Of Your Next Grinder Pump Installation
THANK YOU FOR 14 YEARS OF SUCCESS. WE ARE NOW CLOSED FOR BUSINESS.
With the patented Bal-Last™ Interlocking Ballast Block System
13k+
Over 13,000 Installations Since 2010
5k lbs
Structural Concrete
5 Minutes
Average Install Time
Across 16 States
(And Growing)
Bal-Last™ was created in 2010 as a solution to providing goof-proof ballast for grinder pump installations in wet, coastal and flood-plain regions. Bal-Last™ is an ideal solution for areas with high ground water, eliminating risk from poor installation and providing bulletproof ballast that is adaptable to any site conditions.
Simply drop the pins in our patented interlocking blocks to secure them around your pump chamber, place, and backfill. There’s never a need to climb down into a wet and muddy hole again!